Saturday, 19 October 2019

Some Layout Work From This Week

Took time away from my SCLAIR covered hopper and other weathering projects to do a bit of actual work on the layout that I'd been putting off for a while. I've been wanting to move the Midwest Plastic industry a bit further along, but doing so was going to mean re-arranging a bit of track work. And this week I finally forced myself to do it.  Took a little over 3 hours to get everything in place and at least operational. The only real complication was that I had to move an electrical feeder as well.
Above, these two switches and the diamond had been located about 6 feet to the right.  I moved them this week so that the switch on the left will become the lead to the Midwest Plastics spur. I did this so that the lead will be in the same direction as the one to my Parts Plant, which is next to it.  The switch on the right will lead to an industry to be named later.

Anyway, here's the Midwest Plastics industry (two separate buildings, plus the silos are separate as well), sitting on my workbench (again), this time to be permanently set onto a piece of MDF so that I can move it to and from the layout easily to work on it.


The buildings have been epoxied down onto the MDF, and the spur is complete with ballast and weeds.

 And here is Midwest Plastics in place and at least operational on the layout.

Oh, and speaking of that parts plant, I'd like to come up with a name for it sometime, so if you've got any ideas...that's it in the background of the photo below.



No comments:

Post a Comment