Friday 19 July 2024

Layout Photos

 Just putting up a few looks around the layout...

This warehouse is moved on a temporary or trial basis to this section of the layout.  I kind of like the idea, but the building is too close to that new overpass.

A look at the four-laner that I call the Gratiot Avenue overpass

Low-boy trailer loaded with a Case excavator

GP38 813 caught switching a couple of boxcars

And just a look at the spur at one of the warehouses on South Industrial Blvd.

That's about it for now.  Have a nice week everyone.

4 comments:

  1. Replies
    1. This comment has been removed by the author.

      Delete
  2. Your pavement in the lead photo looks very good; have you detailed how that was done?

    ReplyDelete
    Replies
    1. Hello Roger...the "concrete" between the rails and between the 2 sets of track is styrene cut and filed to fit, and painted. The "concrete" outside of the tracks is wall spackle painted.

      Delete